Render respray in Kirkby-in-Ashfield

Follow the changes in the building before deciding whether every face should share a new coating.

Call 01623 579297

Illustrative junction between a coated rendered wall and retained brickwork.

A render respray in Kirkby-in-Ashfield can involve surfaces that were finished at different times. The lower wall, an upper gable and a later extension may look connected while retaining different materials or paint histories. Before choosing one new colour, ask the assessment to identify those parts and the reason for including each. The quotation should then explain which surfaces are suitable to retain, how they will be prepared and where the decorative work stops.

Record the older finishes by level

Ashfield’s September 2004 Kirkby Cross appraisal describes the older part of the Waggon and Horses with rendered ground-floor walling and whitewashed upper frontage, gable and chimneys. This is a historical description of one named building, not a current condition survey or a specification for neighbouring properties. It shows why an elevation should not be assumed to have one uniform coating history.

For your building, mark the changes in texture and finish on a photograph. Add any records of previous work to the corresponding area, especially where one level was repainted separately. Ask the contractor which layers can be identified and whether further investigation is needed before a compatible coating is proposed. A useful schedule keeps known information separate from assumptions still to be checked.

Illustrative close view of worn paint on an older textured rendered wall.

Keep a later brick addition outside the paint scope unless agreed

The same appraisal describes the building’s later eastern wing as coursed red brick. That material change creates a different question from renewing the finish on the older coated section. On a property with a comparable junction, show which brick faces are to remain unpainted and which adjoining rendered faces are included in the colour change.

Ask for a sample that can be seen beside the retained addition. The aim may be to make the old and new parts sit comfortably together rather than force them into one finish. Protect the brick during preparation and application, and identify the stopping line at returns or projecting details. Any proposal to coat previously bare masonry requires a separate assessment and an explicit decision.

Resolve what the new coating is being asked to do

Explain whether you want a different colour, a more consistent appearance across earlier patches or a response to peeling and staining. These are different briefs. Ask the assessor to identify defects that need repair and any appearance difference that may remain after decoration. A larger decorative area should be presented as a defined option with a reason for its extent.

PRB’s maintenance guidance notes that aged render changes colour and repairs may remain visible. Use a representative sample to discuss the likely appearance where older work is part of the concern. Keep texture and surface level separate from colour matching. The proposal should describe what preparation is included and the finish being offered, so both parties can judge the result against the same expectation.

Compare a single project with a phased programme

If the lower frontage needs attention first, ask where that stage would finish and how the upper wall will be accessed later. A neat visual line alone may not settle the preparation or product requirements at the junction. Compare the full programme with the phased option, including any repeated access and protection work.

Keep the product and colour reference for each stage, and discuss how a later batch or changed surface condition will be handled. Do not assume that a written colour code guarantees identical appearance years afterwards. If the property is managed or occupied by more than one user, confirm who can authorise a change in extent and how each occupier will be told about temporary access restrictions.

A clear schedule for a mixed-age Kirkby elevation
AreaRecord for the proposal
Older lower wallKnown render and coating history
Upper face or gableSeparate condition and access findings
Later brick additionRetained surface and protected boundary
Phased workExtent, product reference and later-stage assumptions

Specify preparation from the retained background

A survey should identify loose coating, contamination and repairs that affect the new finish. Ask which areas need a trial and what question the trial will answer. If preparation exposes an unexpected layer, the quotation should explain how the contractor will report it and obtain agreement before extending the work.

Ask how the preparation will differ between the older lower wall, the upper finish and any later repair. An unidentified white layer should remain an investigation item until it can be assessed. If the work is phased, record what will be left at the boundary and what the next stage must revisit. The resulting specification should name the proposed coating and link its requirements to the backgrounds actually retained.

Close the small fitting decisions before coating starts

Identify brackets, signs, cables and rainwater fittings that cross the proposed finishing boundary. Agree which stay, which are removed and who completes any resulting repair. Work on a metal fixing or an opening should be coordinated before the final colour is applied, with retained surrounding material protected throughout.

For the first call, have the photographs, approximate extent and available coating records ready. Mention any planned alterations or access limitations that could change the sequence. After the survey, compare proposals against the same marked elevation and ask for differences in repair and preparation to be explained. Retain that final scope with the coating reference and completion photographs for the next maintenance decision.

Questions and answers

Can older and newer parts use different products in the same shade?

That may be considered where their backgrounds require different systems, but the combination needs a suitable specification and a sample comparison. Record both products and the expected visual relationship rather than assuming matching codes make the finishes identical.

What if there is no record of the old white finish?

Describe it as an unidentified existing finish and arrange assessment. Avoid assigning a product from colour or appearance alone. The contractor should explain what can be established on inspection and what further investigation is needed before a coating is selected.

Local context

The appraisal distinguishes rendered ground-floor walling from whitewashed upper frontage, gable and chimneys on the older part of the Waggon and Horses.

Named Waggon and Horses building, Kirkby CrossEvidence period: Adopted September 2004Source checked: 22 November 2026Ashfield: Kirkby Cross Conservation Area Appraisal

It describes a later eastern wing built in coursed red brick.

Named Waggon and Horses building, Kirkby CrossEvidence period: Adopted September 2004Source checked: 22 November 2026Ashfield: Kirkby Cross Conservation Area Appraisal